1. navigation
  2. content
  3. Editor
content

Results of the study 2015

Results

Co-financed by the European Union

(© Bildrechte)

 

The final reports with the detailed results for the several activities of the study for the new railway line Dresden - Prague are finally completed for the Saxony part of the railway line.

The compilation of the study was done through by the planning office “Krebs und Kiefer” in cooperation withand whose their subcontractors as well as under consideration of the geological findings of the Saxon State Office for the Environment, Agriculture and Geology and the(LfULG) / TU Bergakademie Freiberg and in cooperation with the Czech partners.

Marginalspalte

© Institution